Get 2023 Free SAP C_TS422_2021 Exam Practice Materials Collection [Q36-Q52]

Share

Get 2023 Free SAP C_TS422_2021 Exam Practice Materials Collection

Get Latest and 100% Accurate C_TS422_2021 Exam Questions

NEW QUESTION # 36
Why would you use phantom assemblies?

  • A. To reduce the number of changes required in bills of materials
  • B. To simplify the structure of bills of materials
  • C. To increase the number of planning levels
  • D. To make the assignment of components easier
  • E. To reduce the number of material masters

Answer: A,B,D


NEW QUESTION # 37
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?

  • A. Specify a positive planning horizon in the strategy profile.
  • B. Specify a positive offset time in the strategy profile.
  • C. Specify a negative lanning horizon in the strategy profile.
  • D. Specify a negative offset time in the strategy profile.

Answer: D


NEW QUESTION # 38
For a production version to be valid and consistent what requirements must be fulfilled?

  • A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • B. The assigned routing must NOT have alternative sequences.
  • C. The lot size range must be within the lot-size range of the assigned routing.
  • D. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • E. The assigned routing must be a rate routing.

Answer: A,C,D


NEW QUESTION # 39
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

  • A. In-house production time
  • B. Total replenishment lead time
  • C. Operation duration
  • D. Planed delivery time

Answer: A,D


NEW QUESTION # 40
What does forecasting in demand planning cycle include?

  • A. One-off events
  • B. Past quotation quantities
  • C. Past sales order quantites
  • D. Market intelligence
  • E. Past procurment quantities

Answer: A,C,D


NEW QUESTION # 41
Which business processes are affected by setting in the order type-dependent parameters?

  • A. Define integration to cost accounting.
  • B. Intiate quality inspections.
  • C. Implement engineering changes.
  • D. Select master data.

Answer: A,D


NEW QUESTION # 42
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements without checking the capacity of a work center.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP creates capacity requirements only if the work center has sufficient capacity.
  • D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

Answer: A


NEW QUESTION # 43
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

  • A. Plants parameters
  • B. MRP controller
  • C. MRP group
  • D. MRP profile

Answer: C


NEW QUESTION # 44
Which materials have a negative quantity in a bill of materials or in a recipe?

  • A. By-products
  • B. Continuous flow materials
  • C. Co-products
  • D. Bulk materials
  • E. Waste products

Answer: A,B,C


NEW QUESTION # 45
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

  • A. SAP Ariba
  • B. SAP Fieldglass
  • C. SAP SuccessFactors
  • D. SAP Concur
  • E. SAP Hybris

Answer: A,B,D


NEW QUESTION # 46
You want to use capacity availability checks for production orders. Which settings have to be made for this?

  • A. The Relevant for Finite Scheduling indicator must be set
  • B. An overall profile must be assigned in the checking control.
  • C. The PRT Availability Check must be set in the checking control.
  • D. A checking rule must be assigned in the checking control

Answer: A,B


NEW QUESTION # 47
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)

  • A. Use heuristic.
  • B. Use a planning group.
  • C. Use a resource group.
  • D. Use a propagation range.

Answer: A


NEW QUESTION # 48
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When you create a planned order
  • B. When you create a sales order
  • C. When the MRP result are saved
  • D. When you deliver a sales order

Answer: B


NEW QUESTION # 49
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

  • A. Fill up based on the lot size procedure
  • B. Fill up to the reorder stock level
  • C. Fill up to the maximum stock level
  • D. Fill up to the safety stoc level

Answer: A


NEW QUESTION # 50
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

  • A. Create object selection variant for transportation lane-related alerts.
  • B. Assign the overall profile to the authorization profile.
  • C. Create object selection variant for product-related alerts.
  • D. Assign the alert profile to the overall profile.

Answer: C,D


NEW QUESTION # 51
For what production type are production orders used?

  • A. Period and quantity-oriented production
  • B. Replenishment controlled by control cycles
  • C. Discrete manufacturing processes
  • D. Process manufacturing processes

Answer: C


NEW QUESTION # 52
......

Maximum Grades By Making ready With C_TS422_2021 Dumps: https://www.2pass4sure.com/SAP-Certified-Application-Associate/C_TS422_2021-actual-exam-braindumps.html

Prepare C_TS422_2021 Exam Questions Recently Updated Questions: https://drive.google.com/open?id=1mWIBzyuZeSyM-1Oo4iEZC6EPCoZeKnDv