
Get 2023 Free SAP C_TS422_2021 Exam Practice Materials Collection
Get Latest and 100% Accurate C_TS422_2021 Exam Questions
NEW QUESTION # 36
Why would you use phantom assemblies?
- A. To reduce the number of changes required in bills of materials
- B. To simplify the structure of bills of materials
- C. To increase the number of planning levels
- D. To make the assignment of components easier
- E. To reduce the number of material masters
Answer: A,B,D
NEW QUESTION # 37
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?
- A. Specify a positive planning horizon in the strategy profile.
- B. Specify a positive offset time in the strategy profile.
- C. Specify a negative lanning horizon in the strategy profile.
- D. Specify a negative offset time in the strategy profile.
Answer: D
NEW QUESTION # 38
For a production version to be valid and consistent what requirements must be fulfilled?
- A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B. The assigned routing must NOT have alternative sequences.
- C. The lot size range must be within the lot-size range of the assigned routing.
- D. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- E. The assigned routing must be a rate routing.
Answer: A,C,D
NEW QUESTION # 39
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?
- A. In-house production time
- B. Total replenishment lead time
- C. Operation duration
- D. Planed delivery time
Answer: A,D
NEW QUESTION # 40
What does forecasting in demand planning cycle include?
- A. One-off events
- B. Past quotation quantities
- C. Past sales order quantites
- D. Market intelligence
- E. Past procurment quantities
Answer: A,C,D
NEW QUESTION # 41
Which business processes are affected by setting in the order type-dependent parameters?
- A. Define integration to cost accounting.
- B. Intiate quality inspections.
- C. Implement engineering changes.
- D. Select master data.
Answer: A,D
NEW QUESTION # 42
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements without checking the capacity of a work center.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP creates capacity requirements only if the work center has sufficient capacity.
- D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
Answer: A
NEW QUESTION # 43
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?
- A. Plants parameters
- B. MRP controller
- C. MRP group
- D. MRP profile
Answer: C
NEW QUESTION # 44
Which materials have a negative quantity in a bill of materials or in a recipe?
- A. By-products
- B. Continuous flow materials
- C. Co-products
- D. Bulk materials
- E. Waste products
Answer: A,B,C
NEW QUESTION # 45
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
- A. SAP Ariba
- B. SAP Fieldglass
- C. SAP SuccessFactors
- D. SAP Concur
- E. SAP Hybris
Answer: A,B,D
NEW QUESTION # 46
You want to use capacity availability checks for production orders. Which settings have to be made for this?
- A. The Relevant for Finite Scheduling indicator must be set
- B. An overall profile must be assigned in the checking control.
- C. The PRT Availability Check must be set in the checking control.
- D. A checking rule must be assigned in the checking control
Answer: A,B
NEW QUESTION # 47
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)
- A. Use heuristic.
- B. Use a planning group.
- C. Use a resource group.
- D. Use a propagation range.
Answer: A
NEW QUESTION # 48
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?
- A. When you create a planned order
- B. When you create a sales order
- C. When the MRP result are saved
- D. When you deliver a sales order
Answer: B
NEW QUESTION # 49
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up based on the lot size procedure
- B. Fill up to the reorder stock level
- C. Fill up to the maximum stock level
- D. Fill up to the safety stoc level
Answer: A
NEW QUESTION # 50
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
- A. Create object selection variant for transportation lane-related alerts.
- B. Assign the overall profile to the authorization profile.
- C. Create object selection variant for product-related alerts.
- D. Assign the alert profile to the overall profile.
Answer: C,D
NEW QUESTION # 51
For what production type are production orders used?
- A. Period and quantity-oriented production
- B. Replenishment controlled by control cycles
- C. Discrete manufacturing processes
- D. Process manufacturing processes
Answer: C
NEW QUESTION # 52
......
Maximum Grades By Making ready With C_TS422_2021 Dumps: https://www.2pass4sure.com/SAP-Certified-Application-Associate/C_TS422_2021-actual-exam-braindumps.html
Prepare C_TS422_2021 Exam Questions Recently Updated Questions: https://drive.google.com/open?id=1mWIBzyuZeSyM-1Oo4iEZC6EPCoZeKnDv