
OG0-093 Practice Exam Tests Latest Updated on Sep-2021
Pass OG0-093 Exam in First Attempt Guaranteed Dumps!
NEW QUESTION 11
Complete the sentence. The Architecture Landscape is divided into three levels, Capability, Segment, and
____________.
- A. Transition
- B. Solution
- C. Baseline
- D. Strategic
- E. Target
Answer: D
NEW QUESTION 12
Complete the sentence. The TOGAF Architecture Governance Framework includes ________________.
- A. a model for governance including process, content and context
- B. guidance for establishing an Architecture Capability using the ADM
- C. a list of responsibilities for running an Architecture Board
- D. the Architecture Compliance review process and checklists
Answer: A
Explanation:
Section: Part 1
NEW QUESTION 13
Which phase of the ADM establishes a set of Principles?
- A. Phase D
- B. Phase A
- C. Preliminary Phase
- D. Phase G
- E. Phase H
Answer: C
NEW QUESTION 14
Complete the sentence. The Requirements Management process is used to______.
- A. develop requirements for Transition Architectures that deliver business value
- B. validate requirements between ADM phases
- C. organize architecture requirements throughout the ADM cycle
- D. review business requirements
- E. dispose of, address and prioritize architecture requirements
Answer: C
Explanation:
Section: Part 1
NEW QUESTION 15
What is an objective of the Preliminary Phase?
- A. To develop the Architecture Vision document
- B. To operate the governance framework
- C. To develop the Implementation and Migration Plan
- D. To establish the architecture governance process
- E. To ensure conformance requirements for the target architecture are defined
Answer: D
NEW QUESTION 16
Scenario
Please read this scenario prior to answering the Question
Your role is consultant to the Lead Architect within a multinational semiconductor and software design company. Its largest business is in processors, although it also designs system-on-a-chip infrastructure and manufactures memory chips. A characteristic feature of its processors is their low electric power consumption, which makes them particularly suitable for use in portable devices. As well as licensing its technology, the company has several manufacturing divisions.
The company has a mature enterprise architecture practice and uses TOGAF 9 for the basis of its architecture framework. In addition to the EA program, the company has a number of management frameworks in use, including business planning, portfolio/project management, and operations management. The EA program is sponsored by the CIO.
The company has defined a strategic architecture to improve its ability to meet customer demand and improve its ability to manage its supply chain. The strategic architecture called for the consolidation of multiple Enterprise Resource Planning (ERP) applications that have been operating independently in the divisions' production facilities. The goal is to replace the functionality of the existing applications with a new ERP product running as a single instance in the company's primary data center.
Each division has completed the Architecture Definition documentation required to tailor and configure the environment to meet its own specific manufacturing requirements.
The enterprise architects have analyzed the key corporate change attributes and implementation constraints. A consolidated gap analysis has been completed which has identified the gaps across the Business, Data, Application, and Technology domains. Based on the results of the gap analysis, the architects have reviewed the requirements, dependencies and interoperability requirements needed to integrate the new ERP environment into the existing environment. The architects have completed the Business Transformation Readiness Assessment started in Phase A.
Based on all of these factors they have produced a risk assessment.
They have also completed the Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables.
Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.
Refer to the Scenario
You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.
Based on TOGAF, which of the following is the best answer?
- A. You recommend that the enterprise architects conduct a series of Compliance Assessments to ensure that the architecture is being implemented according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.
- B. You recommend that the enterprise architects apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. They should confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the projects. They should then document the lessons learned and generate the final Implementation and Migration Plan.
- C. You recommend that the enterprise architects place the Architecture Definition Document under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. They should then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture without review.
- D. You recommend that the enterprise architects assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. They should then assign a business value to each project, taking into account available resources and priorities for the projects.
Finally, they should generate the Implementation and Migration Plan.
Answer: D
NEW QUESTION 17
According to TOGAF, which document should incorporate the actions arising from the Business Transformation Readiness Assessment technique?
- A. Implementation Governance Model
- B. Architecture Requirements Specification
- C. Architecture Road map
- D. Communications Plan
- E. Implementation and Migration Plan
Answer: E
NEW QUESTION 18
Which of the following are considered as generic Building Blocks in the Solutions Continuum?
- A. Strategic Solutions
- B. Common Systems Solutions
- C. Industry Solutions
- D. Foundation Solutions
- E. Organization-Specific Solutions
Answer: D
NEW QUESTION 19
Which of the following describes a purpose of an Architecture Compliance review?
- A. Identifying the business transformation risks for an architecture project
- B. Identifying stakeholders and their concerns
- C. Identifying relationships between management frameworks
- D. Identifying criteria for procurement activities
- E. Identifying work packages for inclusion in the Architecture Roadmap
Answer: D
Explanation:
Section: Part 1
Explanation/Reference:http://pubs.opengroup.org/architecture/togaf9-doc/arch/chap48.html#tag_48_03
NEW QUESTION 20
An ADM cycle can be used to establish an Architecture Capability within an organization. Which architecture produced in such a cycle would describe the architecture processes and organization structure?
- A. Technology Architecture
- B. Application Architecture
- C. Business Architecture
- D. Data Architecture
- E. Transition Architecture
Answer: C
Explanation:
Explanation
Reference https://pubs.opengroup.org/architecture/togaf9-doc/arch/chap18.html
NEW QUESTION 21
According to TOGAF, which of the following best describes the classification of architectural change in the case where multiple server systems are being consolidated to a single system?
- A. A re-architecting change that puts the whole architecture through an ADM cycle
- B. A simplification change handled via change management techniques
- C. An incremental change handled via change management techniques
- D. A revision change of the enterprise architecture
- E. A bottom-up change to enhance operational capability
Answer: B
NEW QUESTION 22
Scenario:
Please read this scenario prior to answering the question
The ABC company specializes in the development of wind turbine blades for use in large-scale commercial wind energy production systems. The company has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Manitoba. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturer's design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics. However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. The company has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
The company has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
The company has used T0GAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies.
They have adapted their Enterprise Architecture to closely follow the TOGAF 9 framework. All of the company's enterprise architects have been trained and certified on TOGAF 9. Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.
Refer to the Scenario
You are the Lead Architect for this activity.
You have been asked to recommend the best approach to adopt to address the Chief Engineer's concern.
Based on TOGAF 9, which of the following is the best answer?
- A. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.
You recommend that if a deviation from the Architecture Contract is detected, the Manufacturing Architecture Board grant a dispensation ID allow the implementation organization the ability to customize the process to meet their local needs. - B. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.
You ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs. - C. You create an Architecture Contract to govern the implementation and migration process at each site. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. You ensure that the contract addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. You then schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. Based on the results, you ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
- D. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.
You recommend that if a deviation from the contract is detected, the Manufacturing Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
Answer: C
Explanation:
Section: Part 2
Explanation/Reference:
Incorrect:
Not C: correct, but missing contract see 49.2.2..
Note:
* Dispensations
A dispensation is used as the mechanism to request a change to the existing architectures, contracts, principles, etc. outside of normal operating parameters; e.g., exclude provision of service to a subsidiary, request for unusual service levels for specific business reasons, deploy non-standard technology or products to support specific business initiatives.
Dispensations are granted for a given time period and set of identified services and operational criteria that must be enforced during the lifespan of the dispensation. Dispensations are not granted indefinitely, but are used as a mechanism to ensure that service levels and operational levels, etc. are met while providing a level flexibility in their implementation and timing. The timebound nature of dispensations ensures that they are a trigger to the Architecture Compliance activity.
NEW QUESTION 23
Complete the sentence. The Architecture Landscape is divided into levels known as _________________.
- A. Transitional, Complete and Incremental Architectures
- B. Gaps, Plateaus, and Target Architectures
- C. Solution, Foundation, and Corporate Architectures
- D. Baseline, Transition, and To Be Architectures
- E. Segment, Strategic, and Capability Architectures
Answer: E
Explanation:
Section: Part 2
NEW QUESTION 24
Which ADM phase defines the scope for the architecture development initiative and obtains approval to proceed with the architecture development?
- A. Requirements Management
- B. Phase B: Business Architecture
- C. Phase D: Technology Architecture
- D. Phase A: Architecture Vision
- E. Preliminary Phase
Answer: D
Explanation:
Section: Part 1
Explanation/Reference: https://pubs.opengroup.org/architecture/togaf9-doc/arch/chap06.html
NEW QUESTION 25
According to TOGAF, which document should incorporate the actions arising from the Business Transformation Readiness Assessment technique?
- A. Implementation Governance Model
- B. Architecture Requirements Specification
- C. Architecture Road map
- D. Communications Plan
- E. Implementation and Migration Plan
Answer: E
Explanation:
Section: Part 1
NEW QUESTION 26
What document is used to initiate a TOGAF ADM cycle?
- A. Request for Architecture Work
- B. Architecture Vision
- C. Architecture Landscape
- D. Architecture Roadmap
- E. Statement of Architecture Work
Answer: A
NEW QUESTION 27
Which one of the following best describes the purpose of a Change Request?
- A. To review project progress and ensure the implementation is inline with the objectives
- B. To act as a deliverable container for artifacts created during a project
- C. To request a dispensation or to kick-start a further cycle of architecture work
- D. To ensure that the results of a Compliance Assessment are distributed to the Architecture Board
- E. To ensure that information is communicated to the right stakeholder at the right time
Answer: C
Explanation:
Section: Part 1
Explanation
Explanation/Reference: https://books.google.com.pk/books?id=e19eAgAAQBAJ&pg=PA174&lpg=PA174&dq=togaf+9
+change+request+To+request+a+dispensation+or+to+kick-start+a+further+cycle+of+architecture
+work&source=bl&ots=THcMNzDaWa&sig=ACfU3U22CWhlkyjhrUjm_XYQ2Ydt0d1ZmA&hl=en&sa=X&ved=2 ahUKEwiYg564j4ngAhUMD2MBHbMtD9gQ6AEwAXoECAEQAQ#v=onepage&q=togaf%209%20change%
20request%20To%20request%20a%20dispensation%20or%20to%20kick-start%20a%20further%20cycle%
20of%20architecture%20work&f=false
NEW QUESTION 28
Which one of the following statements about TOGAF Building Blocks is true?
- A. The specification of a building block should be loosely coupled to its implementation
- B. The gap analysis technique should be used to identify building blocks for re-use
- C. Building blocks at a functional level are known as Solutions Building Blocks
- D. Solutions Building Blocks are selected in Phases A, B, C and D
Answer: A
NEW QUESTION 29
......
The Open Group Certification Free Certification Exam Material from 2Pass4sure with 365 Questions: https://www.2pass4sure.com/TheOpenGroupCertification/OG0-093-actual-exam-braindumps.html
OG0-093 Dumps Full Questions - Exam Study Guide: https://drive.google.com/open?id=1q6kyogjNrhkDXw1hAlXzrKsJmf2pA8Hv